|
Week - 1 |
Historical Development of Drilling, Concepts: Drilling types |
|
Week - 2 |
Diamond Drilling and Rotary Drilling, Introduction of Machinery and Equipment |
|
Week - 3 |
Usage of DCDMA and CMS Drilling Standards |
|
Week - 4 |
Ground (Foundation) Drilling, Injection Drilling |
|
Week - 5 |
Injection Mixture Ratios, Injection Additives, Injection Pressures |
|
Week - 6 |
Injection Mixture Ratios, Injection Additives, Injection Pressures |
|
Week - 7 |
Preparation and Application of Mixtures |
|
Week - 8 |
Drilling, Scanning, Logging, Sequestration, Equipment, Washing-Graveling, Pump Experience in Drilling Wells |
|
Week - 9 |
Drilling, Scanning, Logging, Sequestration, Equipment, Washing-Graveling, Pump Experience in Drilling Wells |
|
Week - 10 |
Drilling, Scanning, Logging, Sequestration, Equipment, Washing-Graveling, Pump Experience in Drilling Wells |
|
Week - 11 |
Field Tests Conducted in Drilling Wells: Calculation of Test Data and Evaluation of Results |
|
Week - 12 |
Field Tests Conducted in Drilling Wells: Calculation of Test Data and Evaluation of Results |
|
Week - 13 |
Preparation of Drilling-Injection well logs, sections and reports suitable for the purpose. |
|
Week - 14 |
Preparation of Drilling-Injection well logs, sections and reports suitable for the purpose. |