Week - 1 |
The analysis of the terminal airspace |
Week - 2 |
Airspace general design criteria and obstacle clearance |
Week - 3 |
Area Navigation (RNAV) procedure design criteria based on different navigation systems (VOR / DME, DME / DME and GNSS) |
Week - 4 |
Identification of waypoints |
Week - 5 |
Path terminators |
Week - 6 |
Minimum distances, Minimum altitude |
Week - 7 |
ATT, XTT and semi area width according to different navigation aids |
Week - 8 |
RNAV rote design |
Week - 9 |
Arrival route design |
Week - 10 |
Departure route design |
Week - 11 |
Holding pattern design |
Week - 12 |
Y-bar and T-bar approach procedure design |
Week - 13 |
OCA/H for RNAV procedures, OCA/H for non-precision approach, OCA/H for precision approach |
Week - 14 |
OCA/H for APV procedures |