Week - 1 |
BASIC CONCEPTS AND CALCULATIONS Headway time Line capacity Breaking distance |
Week - 2 |
BASIC CONCEPTS AND CALCULATIONS Headway time Line capacity Breaking distance |
Week - 3 |
BASIC PRINCIPLES OF SIGNALLING, SIGNALLING AND TELECOMMUNICATION ELEMENTS (Signals, Point machine, Track circuit, Level crossing, Interlocking, CTC) |
Week - 4 |
BASIC PRINCIPLES OF SIGNALLING, SIGNALLING AND TELECOMMUNICATION ELEMENTS (Signals, Point machine, Track circuit, Level crossing, Interlocking, CTC) |
Week - 5 |
BASIC PRINCIPLES OF SIGNALLING, SIGNALLING AND TELECOMMUNICATION ELEMENTS (Signals, Point machine, Track circuit, Level crossing, Interlocking, CTC) |
Week - 6 |
SIGNAL ASPECTS AND ARRANGEMENT OF TRAIN MOVEMENT ACCORDING TO SIGNAL ASPECTS |
Week - 7 |
SIGNAL ASPECTS AND ARRANGEMENT OF TRAIN MOVEMENT ACCORDING TO SIGNAL ASPECTS |
Week - 8 |
TRAIN PROTECTION SYSTEMS (ATS, ATP, ATC) WAYSIDE EQUIPMENT, GSM-R AND COMPONENTS |
Week - 9 |
TRAIN PROTECTION SYSTEMS (ATS, ATP, ATC) WAYSIDE EQUIPMENT, GSM-R AND COMPONENTS |
Week - 10 |
RULES FOR TRANSITION FROM CONVENTIONAL LINE TO ERTMS-LEVELS-1-2 OR VICE VERSA, RUNNING MODES PRINCIPLES, TRAIN MOVEMENT ACCORDING TO FRS STANDARTS |
Week - 11 |
RULES FOR TRANSITION FROM CONVENTIONAL LINE TO ERTMS-LEVELS-1-2 OR VICE VERSA, RUNNING MODES PRINCIPLES, TRAIN MOVEMENT ACCORDING TO FRS STANDARTS |
Week - 12 |
DESCRIPTION OF ETCS/ATP TRAIN CONTROL SYSTEMS AND MOVEMENT OF TRAINS OPERATING UNDER THESE SYSTEMS |
Week - 13 |
DESCRIPTION OF ETCS/ATP TRAIN CONTROL SYSTEMS AND MOVEMENT OF TRAINS OPERATING UNDER THESE SYSTEMS |
Week - 14 |
DESCRIPTION OF ETCS/ATP TRAIN CONTROL SYSTEMS AND MOVEMENT OF TRAINS OPERATING UNDER THESE SYSTEMS |