Week - 1 |
BASIC CONCEPTS AND CALCULATIONS
Headway time
Line capacity
Breaking distance |
Week - 2 |
BASIC PRINCIPLES OF SIGNALLING
SIGNALLING ELEMENTS
( Signals, Point machine, Track circuit, Level crossing, Interlocking, CTC) |
Week - 3 |
BASIC PRINCIPLES OF SIGNALLING
SIGNALLING ELEMENTS
( Signals, Point machine, Track circuit, Level crossing, Interlocking, CTC) |
Week - 4 |
SIGNAL ASPECTS AND TRAIN MOVEMENT ACCORDING TO SIGNAL ASPECTS |
Week - 5 |
SIGNAL ASPECTS AND TRAIN MOVEMENT ACCORDING TO SIGNAL ASPECTS |
Week - 6 |
TRAIN PROTECTİON SYSTEMS (ATS, ATP, ATC)
WAYSIDE EQUIPMENT |
Week - 7 |
TRAIN PROTECTION SYSTEMS (ATS, ATP, ATC),
ONBOARD SYSTEMS,
COMMUCINATION SYSTEMS |
Week - 8 |
RULES FOR TRANSITION FROM CONVENTIONAL LINE TO ERTMS-LEVELS-1-2 OR VICE VERSA,
RUNNING MODES PRINCIPLES,
TRAIN MOVEMENT ACCORDING TO FRS STANDARTS |
Week - 9 |
RULES FOR TRANSITION FROM CONVENTIONAL LINE TO ERTMS-LEVELS-1-2 OR VICE VERSA,
RUNNING MODES PRINCIPLES,
TRAIN MOVEMENT ACCORDING TO FRS STANDARTS |
Week - 10 |
ANALYSIS OF TRAIN MANAGEMENT SYSTEMS ACCORDING TO FRS AND NATIONAL PRINCIPLES, PASSING FAULTY SIGNALS, MOVEMENT AUTHORITY, BACK AND FRONT MOVEMENTS ETC.. |
Week - 11 |
ANALYSIS OF TRAIN MANAGEMENT SYSTEMS ACCORDING TO FRS AND NATIONAL PRINCIPLES, PASSING FAULTY SIGNALS, MOVEMENT AUTHORITY, BACK AND FRONT MOVEMENTS ETC.. |
Week - 12 |
DESCRIPTIONS OF ERTMS AND ETCS/ATP TRAIN CONTROL SYSTEMS AND THE MOVEMENT AND TRANSITION OF TRAINS OPERATING UNDER THESE SYSTEMS |
Week - 13 |
DESCRIPTIONS OF ERTMS AND ETCS/ATP TRAIN CONTROL SYSTEMS AND THE MOVEMENT AND TRANSITION OF TRAINS OPERATING UNDER THESE SYSTEMS |
Week - 14 |
DESCRIPTIONS OF ERTMS AND ETCS/ATP TRAIN CONTROL SYSTEMS AND THE MOVEMENT AND TRANSITION OF TRAINS OPERATING UNDER THESE SYSTEMS |