Week - 1 |
Definitions which are important for Air Traffic Control |
Week - 2 |
Air Traffic Control Units:Aerodrome Control Unit, Approach Control Unit, Area Control Unit |
Week - 3 |
Altimeter setting prosedures and transponder |
Week - 4 |
Use of ATS Surveillance System in The Air traffic control Service |
Week - 5 |
Radar identification technics: PSR (Primary Surveillance Radar),SSR (Secondary Surveillance Radar) and ADS-B (Automatic Dependent Surveillance-Broadcast) |
Week - 6 |
Radar identification technics: PSR (Primary Surveillance Radar),SSR (Secondary Surveillance Radar) and ADS-B (Automatic Dependent Surveillance-Broadcast) |
Week - 7 |
MRVA Charts, Instrument Approach Charts,Enroute charts,Vector to approach course |
Week - 8 |
Radar coordination and hand off |
Week - 9 |
Vectoring in ATS Surveillance System andOperations on Parallelor Near parallel Runways |
Week - 10 |
Separation minima based on ATS surveillance systems |
Week - 11 |
Separation minima based on ATS surveillance systems |
Week - 12 |
Assignment of levels for Area Radar control and Radar Approach Service |
Week - 13 |
Speed restriction,Radar Traffic information,Radar Control Phraseology |
Week - 14 |
Emergency situation on radar |